Brajčino small hydropower plant

We commissioned the small hydropower plant at the Brajčino site in May 2014. Difficult ground conditions in the water catchment area were discovered in good time during the construction phase, and the necessary blasting work was duly carried out. The height difference between the Brajčino turbine house and the water catchments located above it measures 115 metres, giving a pressure in the filled penstock of 11.3 bar. The pelton impeller spoons are therefore impacted by water jets impinging at the speeds of around 46 metres per second (approx. 166 km/h), generating turbine speeds of 500 rpm to drive the generator and produce electricity.

Facility type

Hydropower plant

Location

Brajčino, North Macedonia

Capacity

1.440 megawatts

Completion

October 2014

Further investments

Warnhinweis: Vorsicht vor möglichen betrügerischen Anrufen im Namen der PCC SE

Wir möchten Sie vorsorglich vor betrügerischen Telefonanrufen warnen, bei denen sich die Anrufenden fälschlicherweise als Mitarbeitende der PCC SE ausgeben.

Bitte beachten Sie: Die PCC SE fordert Sie niemals telefonisch zu Geldüberweisungen auf.

Erhalten Sie eine entsprechende Aufforderung, beenden Sie bitte das Gespräch und leisten Sie keine Zahlung. Geben Sie zudem keine persönlichen Daten sowie Konto- oder Zugangsdaten am Telefon weiter.

Sollten Sie einen solchen Anruf erhalten, informieren Sie uns bitte. Sie erreichen unseren Bereich PCC Direktinvest per E-Mail unter direktinvest@pcc.eu oder telefonisch unter +49 (0)2066 90 80 90.

Ihre PCC SE